Coming MVP3. All data on this page is simulated. Edge agent + cloud diagnostic engine ships after MVP1 + MVP2 stabilise.
Stops this week
23
−12% vs prev
Avg MTTR
9.2min
−68% with PLCBrain
Phantom stops
7
root cause found
Active monitors
12
PLCs across 3 sites

Pitch

The pain

Phantom stops eat 15–30% of downtime on packaging lines. Average loss: €2-15k per hour. MTTR: 25-45 minutes — most of it spent figuring out which sensor / interlock / counter caused the stop.

HMI screens show fixed alarms only. The phantom never shows up. TIA Portal Online needs a sitting engineer. SCADA is too high-level.

The fix

Operator hits "Why Stop?" on a tablet. Edge agent snapshots PLC state — I/Q tags, marker bits, DB values, diagnostic buffer, OB execution stats, FB call hierarchy.

Claude has the source code (cached) + the snapshot. Returns a ranked diagnosis with probabilities and a plain-language action plan in the operator's language.

Recent incidents (simulated)

WhenSite / LineVerdictMTTR
2h ago Bratislava-1 / FILL-02 Resolved Photocell 4 dirty (95%) 6 min report →
Yesterday Brno-2 / WRAP-01 Resolved Servo overtemp interlock (87%) 11 min report →
2 days ago Bratislava-1 / PACK-03 Resolved Stack light cable break (78%) 14 min report →